Showing posts with label CONCRETE. Show all posts
Showing posts with label CONCRETE. Show all posts

November 15, 2014

Huecos en forjado

Del libro: Los forjados reticulares: diseño, análisis, construcción y patología.
Florentino Regalado Tesoro.
esquema real de forjado proyectado, calculado, construido y funcionando bien, !afortunadamente!, sin saber a ciencia cierta en que se basa, pero ¿era necesario?

            



November 7, 2014

concrete bunker home

The half-submerged bunker has an internal area of just nine square metres, with less than two-metres head height, so furnishings had to be kept to the absolute minimum and everything had to be custom made to make optimum use of space. (http://www.dezeen.com/2014/10/28/b-ild-concrete-wartime-bunker-pavilion-conversion-holiday-home-netherlands/)






November 3, 2014

Video: Johnson Wax building test column. Collapse.


Building inspectors required that a test column be built and loaded with twelve tons of material. The test column, once it was built, was tough enough that it was able to be loaded fivefold with sixty tons of materials before the "calyx," the part of the column that meets the lily pad, cracked (crashing the 60 tons of materials to the ground, and bursting a water main 30 feet underground). After this demonstration, Wright was given his building permit.

October 29, 2014

Stair fail


Casa do Vidro

Casa do Vidro, Sao Paulo, Brasil, 1951, arq. Lina Bo Bardi: the insides are on the outside


                           




October 27, 2014

Plaza Arenas de Barcelona

The original 19th century bullring was raised above the levels of the surrounding streets with ramps and stairs within the surrounding plinth providing access. However, the redevelopment – which involved the excavation of the base of the façade and the insertion of composite arches to support the existing wall and create new spaces for shops and restaurants – establishes a new, open public realm around the building providing level access to a wide range of retail facilities. New steel arms and a ring of concrete hold the base of the old facade in place. (Rogers Stirk Harbour + Partners)











Revolution tower, Panama.

Revolution Tower is an office building located in Panama City Rep of Panama. The main structure is reinforced concrete, consisting of a core shear walls and eight circular columns that form a circle centered about the axis of the building. These 8 columns are linked by reinforced concrete beams post-tensioned partially forming a circle, also centered about the axis of the building.




January 28, 2013

Parasite Architecture 2



Designed as a prototype house, meant to showcase the combination of prefabrication technologies and ‘tailor-made design’, the ‘Las Palmas Parasite’ was constructed on the protruding elevator shaft of the exhibition warehouse – which dictated the size/shape of the plan. The ‘object’ was constructed on the roof of the existing building, and in true parasitic form it drew all of its services – water, sewage, and electricity – from the warehouse, while also drawing on its support structurally.


January 17, 2013

Parasite Architecture



 Arseniy Borisenko and Peter Zaitsev of the architectural firm Za Bor Architects have developed the concept of the office of the parasite to Moscow. Their project involves the use of open spaces between buildings to create office. Moreover, office buildings do not restrict travel to the yards. The first such office should be a proper studio architectural firm za bor, which is planned to build between the two houses on the street, 5th Kozhukhovsky.




The main facade is made of lightweight and durable polycarbonate, the facade facing the courtyard, flat and fully glazed. Read more: http://forum.pclayer.com/the-project-office-parasite-architectural-firm-za-bor-t13762.html#ixzz2IEaznsbh



French architects Opus 5 have built a concert hall on top of a former seventeenth century convent in northern France.  http://www.dezeen.com/tag/parasites/


January 15, 2013

Column Cap



Tuchschmid-WALM® reinforced column caps offer a modern solution in compliance with SIA 262 with substantial advantages over conventional systems. Thanks to established calculation methods and improvement in the adhesion between steel and concrete, designs with thin slabs and slender columns can be constructed. Solve all punching shear problems, including edge, expansion and corner columns, shear walls and in foundations (http://tuchschmid.ch/en)